NTPC Cutoff through GATE 2020
NTPC Limited is the largest power utility in the country with an installed capacity of 43.143 MW and an additional 23,839 MW capacity under construction. To realize the vision of becoming a world-class power major, NTPC plans to become a 1,28,000 MW company by the year 2032. The company has been conferred with coveted Maharatna status by Govt. of India for its outstanding achievements over the years.
Graduate engineers in Mechanical, Electrical, Instrumentation, Electronics & Communication, Civil Engineering will be eligible to apply. Check the cutoffs for the previous year below.
NTPC Cutoff through GATE 2020
Discipline Marks/Rank UR OBC SC ST PWD Electrical GATE Marks 70 64.67 59 60.67 36.33 Rank 156 442 1088 840 11375 Mechanical GATE Marks 76.06 72.57 62.84 59.31 39.14 Rank 191 500 2516 3776 16699 Electronics GATE Marks 72 66 58.33 56.67 40 Rank 58 190 710 900 4859 Instrumentations GATE Marks 68.33 62.67 42 35.33 26 Rank 60 113 736 1079 1869
NTPC Cutoff through GATE 2017
Discipline Marks/Rank UR OBC SC ST PWD Electrical GATE Marks 62.84 59.60 44.35 48.98 31.59 Rank 206 380 3221 1857 10273 Mechanical GATE Marks 81.02 77.26 69.76 62.94 41.89 Rank 280 638 2010 4300 17332 Electronics GATE Marks 65.95 64.52 56.08 51.28 45.23 Rank 112 139 632 1279 2570 Instrumentations GATE Marks 72.35 71.01 60.01 47.02 34.01 Rank 88 102 371 929 1937 Civil GATE Marks 82.43 75.85 64.04 66.84 40.11 Rank 42 179 973 693 7855
NTPC Cutoff through GATE 2016
Discipline Marks/Rank UR OBC SC ST Electrical GATE Marks 66.69 61.11 50.93 49.28 Rank 223 559 1955 2305 Mechanical GATE Marks 76.31 68.69 55.83 49.72 Rank 439 1309 5035 8062 Electronics GATE Marks 76.31 68.69 55.83 49.72 Rank 138 497 1675 1732 Instrumentations GATE Marks 63.33 55 43 46.67 Rank 97 299 934 696 Civil GATE Marks 73.12 70.34 64.84 57.56 Rank 74 124 309 811 IT GATE Marks 65.93 55.76 50.71 37.71 Rank 181 755 1236 4193






